Buleleng Build

 


Construction of 3 Bridges Targeted for Completion in December 2021

Amid the Kopid which greatly hampered activities in all fields of the Buleleng Regency Government through the Buleleng Regency Public Works and Spatial Planning Service (PUTR)

 targets the construction of 3 bridges in Buleleng Regency to be completed before the end of the year. The source of this development fund is through the Special Allocation Fund (DAK) of Rp. 14.2 Billion. This was revealed by the Head of the Highways Division of the Public Works and Spatial Planning (PUTR) Kab. Buleleng, Ketut Budiyasa, ST when met in his office on Tuesday (10/8).

Furthermore, with the permission of the Head of PUTR, the Head of Budiyasa explained that the construction of these 3 bridges includes the Tukad Buleleng bridge to be precise on the Bakung road, Tukad Pangkung Dalem on the Gitgit-Wanagiri road, and the Tukad Daya Bridge in Bungkulan. "The progress of the construction of the Tukad Buleleng Bridge to date has reached 5.42%, the Tukad Pangkung Dalem Bridge is 2.96%, and the Tukad Daya Bridge is 12.04%," he explained.

He added, the Tukad Buleleng Bridge with a span of 40m is expected to be completed on November 14, 2021, the Pangkung Dalem Gitgit Bridge with a span of 40m is estimated to be completed on December 13, 2021, and the Tukad Daya Bungkulan Bridge with a span of 21m is estimated to be completed on December 1, 2021.

Regarding the obstacles, Budiyasa said that there were a few obstacles experienced during the foundation construction. "Yesterday we had a problem with drilling the foundation pile, the ground was a bit hard and several times the equipment was damaged and now the casting stage has started," he explained.

Budiyasa hopes that the bridge construction will be completed on time so that people can enjoy this public facility safely and comfortably.

BULELENG REGENCY REHABILITATION OF IRRIGATION NETWORKS THROUGH SPECIAL ALLOCATION FUND (DAK) 2020

To support the national development priority targets set out in the 2020-2024 RPJMN and 2020 RKP, namely to support the National Priority for Food, Water, Energy, and Environment Security, the Buleleng Regency Government through the Public Works and Spatial Planning Service (PUTR) is committed to rehabilitating the condition of irrigation infrastructure and always carry out maintenance sustainably and sustainably on irrigation infrastructure. In 2020, the PUTR Office of Buleleng Regency has completed carrying out 4 (four) work packages for the Rehabilitation of Irrigation Networks through the Physical DAK Reserve fund source with the location of the activities:

The Shot Irrigation Area (DI) is located in Mengening Village and Tamblang Village, KubuAddan District

Irrigation area (DI) Babakan Sambangan located in Sambangan Village, Sukasada District

The Dangin Jalan Irrigation Area (DI) is located in Petakankan Village, Buleleng District

The Jagaraga Irrigation Area (DI) is located in Jagaraga Village, Menyali Village and Sawan Village, Sawan District.

This irrigation network rehabilitation work focuses on rehabilitating irrigation canals and complementary buildings on primary and secondary irrigation networks according to the mandate of the Minister of Public Works and Public Housing No. has a service area of ​​rice fields of less than 1000 Ha. The expected outcome with this irrigation network rehabilitation work is that the condition of the irrigation network that has been handled in 2020 will become stable with the coverage of the rice fields served covering an area of ​​733 hectares.

Village Food Land as a Place for Residents to Learn

One of the biggest impacts of the Corona Virus is in the field of Education. All access to education was completely stopped which resulted in the ineffectiveness of the teaching and learning process in schools for almost 5 months. This certainly affects the intellectual development of students, especially in kindergarten and elementary school students. Of course this is one of the concerns for residents who have kindergarten and elementary school children. This has become a special attraction for the wall repairman (Dewa Komang Yudi Astara) to make the Village Food Land as a place to study or a place to accommodate for residents who want to learn, especially kindergarten and elementary school children in the Tembok Village area to reflect on their memories of the lessons they have learned at school. each. This activity began at the end of June 2020 which involved several residents who dedicated themselves to teaching these children, including one of the original Wall Students who was studying at Gadjah Mada University (UGM) who happened to be affected as well which resulted in temporarily returning home. This activity received a good and good response from the residents of the Tembok Village area, at least it is a positive thing that can be given to kindergarten and elementary school children who have long missed school conditions, of course the learning situation and conditions are much different from the conditions in formal schools. In addition to learning, they were also introduced to various kinds of vegetables and the process of planting and harvesting these vegetables. Some of the vegetable plants found on the land are Tomatoes, Green Vegetables, Chilies, Kangkung



Post a Comment

Previous Post Next Post